late April
The previous week when they came to build the cabin base and we had 3 electricians here as well as Will and I cracking on around them was a little hectic. But we now have far fewer extension leads trailing around the floor and fancy lights in bedroom, shower & WC. Power has been run out to garage for workshop and connection to cabin at a later date. Will and I started pealing the lean to car port to convert it into a workshop and rough store area. Garage is dry clean storage. We’ve rebuilt the side and hopefully can sort the roof next week when he’s here. I’ve also ripped out what was left of wall between the living area and what was originally bedroom 3. I think we have decided to leave it open like this. Today we finally decided to keep the plastic conservatory at least for now and that we are painting the house matt black. So I’ve been T&Ging inside while D paints outside. What a transformation.