fresh batchMixed up some shellac after dinner last night. Brought it to my desk to shake it so it would be ready in the AM. doneGot the right drawer fitted moving in/out smoothly. This one went quicker than the left drawer did. Next batter was flushing the front face flush with the rail. readyThe on hole centers is 3 3/8". Center punched the holes for the screws now. I'll install the pull after I'm done applying the shellac. easierGravity at my age sucks pond scum. Rather then do my dance steps trying to kneel and slap shellac on the base, I put it on the workbench to do that. It made for a slow day getting 3 coats on it to finish it up.hmm.......Attaching the top was so much better and easier then doing Miles's. Predrilling and attaching the table top clips paid dividends. I only had to use this ratcheting wrench on 4 clips. Got ahead of myself on attaching the top again. I wanted to get the drawer pull out stops installed before top going on. Totally forgot about them and it is…
No comments yet. Log in to reply on the Fediverse. Comments will appear here.